Acoustic Enclosure, Gwynt Y Mor, Offshore Wind Farm Case Study

Project Details

Client: National Grid
Customer: Siemens Transmission & Distribution
Service: Acoustic Enclosure
Project completion: September 2012

The Project

Siemens Transmission and Distribution employed Kimpton Energy Solutions to assist them in meeting the noise emissions criteria set out in the planning permission.

A noise impact assessment determined that an insertion loss of 20dB @ 100Hz was required for each transformer to alleviate the potential noise disturbance.

Kimpton Energy Solutions designed, manufactured and installed two acoustic enclosures. Each enclosure was shipped to site in a modular kit form for ease of transportation and then erected around each of the 355 tonne oil-filled transformers.

Acoustic Enclosure at Gwynt Y Mor